产品
product展厅/product全产业链采购//
productPP空心模板板塑料模板
Image 2Image 3Image 4Image 5Image 6
Image 1
Preview
基本信息产品详情证书

基本信息

型号编号BZ-PP
类型扁平的
材料PP
成型方法挤压
应用程序函数式组件
材料属性高影响力
服务市场建筑与建设
定制的非定制的
用法外部
颜色单一颜色
表面处理完成
证书ISO9001:2015
厚度12-21毫米
可重复使用次数五十倍
优势防水轻便
运输包货盘
规格1220乘以2440毫米除以915乘以1830毫米
商标备注
起源中国
商品编码3925900000
生产能力每天1000件
包装尺寸2.45cm * 1.25cm * 1.00cm
包装总重量1400 千克
包装尺寸2.45cm * 1.25cm * 1.00cm
包装总重量1400.000公斤

产品详情

Product Description
detail
Preview
Product Specification
detail
Preview
detail
Preview
Cutting and customized size are available.
detail
Preview
Product Advantages
detail
Preview
1. Durable, the
reusable time
can reach more than
60 times, long service life.2. No
absorption of moisture, no deformation, no mildew;
Long-term immersion stratification in the water,
no bubbles,
sheet size stability, especially suitable for underground and damp environment.3.Demould
easily. No need
brushing release agent,
only
tapping,
the formwork
will
fall off.Shorten working
hours
and
speed up the construction schedule
efficiently.4. Easy
to
process. Sawing, drilling
and nailing are all available.Formworks can be combined
vertically
and horizontally optionally.5.Light weight,
high
strength,
high
hardness, impact resistance, wear resistance.
6.Surface is smooth, bright and clean;
concreting and forming
effect is good.
7.Good toughness.It could be used as
cambered
special-shaped formwork.
8.Acid and alkali resistance, corrosion resistance;
Very suitable for
the
engineeringapplication
in
coastal
areas,
mine,
as well as seawall.It is
need not do any preservative treatment
both in using and
storing the formwork,
which
do not
pollute the concrete surface.
9.Waste products can be recycled and
reprocessed,
making
full use of waste materials.This property
can greatly
reduce
the project cost
compared with wooden formwork and bamboo formwork.
10.Environmental protection and energy saving, no pollution.No
any poisonous
or
harmful gas.
11.Easy to remove.Removing is
convenient, quick and safe,
and the
supporting
is
also
easy to operate,
advantageous
to the organization
construction, effectively improving
the construction schedule.
detail
Preview
detail
Preview
detail
Preview
detail
Preview
detail
Preview
Instruction of using Beizhu plastic formwork and H20 beam:
1. Use method is the same as wooden formwork, hollow plastic formwork and batten should be in cross shaped;
2. No need to brush the mold release agent before using formwork;
3. The distance between timbers for 18mm thickness: (A) According to the thickness of the slab concrete, if the
thickness of slab concrete is less than 15cm, the timbers distance should be 350-400mm. If the thickness of slab
concrete is more than 15cm, the distance should be 300-350mm. (B) The distance between timbers of the shear
wall is adjusted by the height and thickness of the wall. For example, the wall is 2800 mm high and 300 mm thick,
timbers distance should be 200-250 mm with 18mm thick plastic formwork. If the shear wall width or the pillar is
thick more than 1m, must add the fixed frame.
4. There shouldn't be gaps between the die shear wall and column combining, there must be timbers in internal
angle (the bottom of the wall) beam to insure the beam frame, wall and formwork connect well. For shear wall,
formwork must be assembled into the whole piece, then hoisting, adjust to be straight. This way can reduce
labor intensity, as well as improve the forming effect.
5. When nailing the formwork and H20 beam, the distance away from formwork edge should be 15-30 mm, the
strength of driving in nail should be moderate; length of nails should be 40-50 mm, not too long or too short.
6. There must be a 15mm seam alowance for the wood in the beam bottom, make the wallboard stand on seam
allowance of wood square, thus can ensure no leakage of slurry and save wallboard material efficiently.
7. Please avoid the peak temperature in one day when matching the mold. Then the effect after releasing mould
is better. Normally, there is no space between formworks, but if the temperature difference is 5-10ºC, then should
reserve 1-2mm gap.
8. Please place the PP formwork as flat as plywood formwork after releasing the mould.
detail
Preview
detail
Preview
Company Profile
detail
Preview
Beizhu Plastic Formwork Company
Beizhu Plastic Formwork Company
was founded in 2008, is located in Suqian City,which is one of the
largest manufacturers of construction plastic formwork in China. Beizhu has production
area about 12000
square meters, 5 production lines and 100 workers.
The construction plastic formwork
has been exported to Finland, Canada, Australia, Russia, Ukraine, KenyaThailand, Korea
and so on. Now Beizhu has 2 agents in Turkey and Thailand.
In 2013
year,Beizhu adopted the Certificate of ISO9001:2008 International Quality Management System.Beizhu keeps
long-term cooperation with all the customers all over the world.
detail
Preview
detail
Preview

证书

标题:TUV certificate
prev
1/8
next
img
Preview
联系我们
发送邮件到:support@bincial.com
PP空心模板板塑料模板
¥144.8 ~ ¥181
化工产业链 · 塑料制品 · 塑料形材
产地中国
avatar icon上海 avatar icon已认证
50人以下 批发/零售/新零售
产品
缤商APP用户后台
关于我们
公司简介加入我们
用户协议
隐私政策
联系我们
合作:135-8566-0971
客服:021-61673695
邮箱:support@bincial.com
地址:上海市浦东新区御桥路1220弄3号
DownloadAPP
视频号
WeChat
公众号
抖音
快手
Copyright© 上海播知科技有限公司 沪ICP备2023012989号-4