





Preview
基本信息产品详情
基本信息
型号 | DAE-C-24 |
腔数 | 24个洞 |
机器输出 | 每小时22000-24000件 |
机器适应领域 | 饮料瓶盖、药品瓶盖 |
交通包裹 | 出口标准包装 |
规格 | 3800乘以1550乘以2100 |
商标 | 大龙 |
起源 | 中国 |
商品编码 | 8477800000 |
生产能力 | 每小时22000-24000元 |
产品详情
Product Description
Preview
The cap compression machine is mainly used to produce the mineral water caps, medical caps , the Juice drink caps, Milk bottle cap and other similar caps with more advantages thank the injection molding machine1. The cap surface have no injection points with good outlook surface for future logo printing and engraving.
The cap compression machine machine
is
with higher productivity than the injection machine production line
to reduce the cap production cost.Less Energy Consumption than the injection molding machine
to reduce the cap production cost.The cap compression machine
is
with the function of quick color changes
to reduce the material wastage during cap color change.
5. The mold cost also will
be less
than the injection caps mold, If you want
to producing another caps, then the cost for the mold will be less .6.Machine mold
have no hot runner system
for less
problems and the maintenance
cost in future production .7. Easy to operate
than the injection molding machine.
The cap compression machine machine
is
with higher productivity than the injection machine production line
to reduce the cap production cost.Less Energy Consumption than the injection molding machine
to reduce the cap production cost.The cap compression machine
is
with the function of quick color changes
to reduce the material wastage during cap color change.
5. The mold cost also will
be less
than the injection caps mold, If you want
to producing another caps, then the cost for the mold will be less .6.Machine mold
have no hot runner system
for less
problems and the maintenance
cost in future production .7. Easy to operate
than the injection molding machine.
Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview
MOULD MANUFACTURE PROCESS
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.
BUSINESS STEPS
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.
Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing3.Interchangeable parts for every cavity.
BUSINESS STEPS
1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery We will delivery the goods to the customers either by sea or by air.
Preview

Preview

Preview
FAQ
Preview
Q: 1 Are you trading company or manufacturer ?
A: We are factory.
Q: 2 Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.
Q: 3. How to go to your factory?
A: You can come to our city by flight, bus or train.It takes 2 hours by flight from Guangzhou to our city.It takes 3.5 hours by train from Shanghai to our city.It takes 1 hour by bullet train from Ningbo to our city.
Q: 4.How about quality control in your factory?
A:
We believe "Quality is above everything". We have professional team to control the quality. Our QC team mainly do the following procedures:
A) Design Optimize control
B) Mould steel hardness Inspection
C) Mould assembly Inspection
D) Mould trial report and samples Inspection
E) Final inspection for mould & packing before shipmentIf you have another question, pls feel free to contact us as below:
Q:5.If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes.DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models - This can save time and money in producing your parts.
Q: 6. What type of plastic material is best for my design/component?
A: Plastic Materials selection depends on the application of your product. We will give you some suggestion after we checked the function of your component. And we can make the mould trial with different material according to your requirement.
Q: 7. What kind of mould can you make?
A:
We can make all kinds of plastic injection moulds and blow moulds.We can suggest you the proper cavity number as per your injection machines sizes.
Q:8. What's your payment method?
A:
By T/T, L/C, Trade Assurance, Western Union.
A: We are factory.
Q: 2 Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.
Q: 3. How to go to your factory?
A: You can come to our city by flight, bus or train.It takes 2 hours by flight from Guangzhou to our city.It takes 3.5 hours by train from Shanghai to our city.It takes 1 hour by bullet train from Ningbo to our city.
Q: 4.How about quality control in your factory?
A:
We believe "Quality is above everything". We have professional team to control the quality. Our QC team mainly do the following procedures:
A) Design Optimize control
B) Mould steel hardness Inspection
C) Mould assembly Inspection
D) Mould trial report and samples Inspection
E) Final inspection for mould & packing before shipmentIf you have another question, pls feel free to contact us as below:
Q:5.If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes.DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models - This can save time and money in producing your parts.
Q: 6. What type of plastic material is best for my design/component?
A: Plastic Materials selection depends on the application of your product. We will give you some suggestion after we checked the function of your component. And we can make the mould trial with different material according to your requirement.
Q: 7. What kind of mould can you make?
A:
We can make all kinds of plastic injection moulds and blow moulds.We can suggest you the proper cavity number as per your injection machines sizes.
Q:8. What's your payment method?
A:
By T/T, L/C, Trade Assurance, Western Union.
Preview